Our projects

From the field.

Real projects and real lessons from the sites where reliable power matters.

Temporary Power Kept 180 Buses on the Road
Case Study · 23 June 2026

Temporary Power Kept 180 Buses on the Road

A cable strike cut power to the refuelling station at a Tweed bus depot late in the day. We installed a temporary generator and cabling that evening so the fleet could be fuelled for the next morning's runs.

Read the full project
The Labels Were Right. The Wiring Wasn't.
Case Study · 5 December 2025

An imported generator arrived with phase and neutral incorrectly identified at the connection point. Commissioning tests found the problem before the set was placed into service.

Read the full project
Standby Power for a Flood-Prone Aged Care Facility
Case Study · 13 November 2025

Standby Power for a Flood-Prone Aged Care Facility

This Tallebudgera aged-care facility can be cut off during floods. We installed a 150 kVA standby system with automatic transfer, remote monitoring and a permanent load bank.

Read the full project
Powering Peace of Mind: 850kVA worth of CATERPILLAR reliability, Building works, Fuel delivery works, and a challenging lift.
Case Study · 12 September 2025

Powering Peace of Mind: 850kVA worth of CATERPILLAR reliability, Building works, Fuel delivery works, and a challenging lift.

When the lights go out at a retired services league, the stakes are higher than comfort — they are financial. Here's how we delivered a turnkey 850kVA backup power solution for Ballina RSL Club.

Read the full project
Backup Power for a Paradise Point Basement
Case Study · 14 August 2025

Backup Power for a Paradise Point Basement

The main priority at this Paradise Point building was keeping the basement stormwater pumps running during an outage, particularly when heavy rain and failed mains power arrive together.

Read the full project
Testing and Upgrading Emergency Power at Grafton Base Hospital
Case Study · 23 February 2025

Testing and Upgrading Emergency Power at Grafton Base Hospital

CPS tested the hospital generator under load, serviced end-of-life air circuit breakers and replaced an unsupported transfer controller — all in stages around essential clinical services.

Read the full project