Find the data plate
Look on the unit or in its manual. Do not remove electrical covers.

Add what you want to power, enter its electrical input, and see a high-level generator size estimate. Your load list starts empty.
Not sure? Leave single phase selected and ask Gold Coast Generators to confirm.
Choose an item or add your own. Typical values can be changed.
Optional for buildings. Use planning rates supplied for your site; add air conditioning, pumps and lifts separately. Do not count the same lighting or outlets twice.
Example only: 100 m² × 10 W/m² = 1 kW. A suitable rate depends on the building; this is not an AS/NZS 3000 maximum-demand assessment.Include only equipment you want to run. All included loads are counted together.
Add equipment above to get started.
Up to three options with suitable running ratings. Gold Coast Generators will confirm compatibility before you buy.
We will not suggest a generator from an incomplete load list.
Look on the unit or in its manual. Do not remove electrical covers.
Use electrical input or rated current. For air conditioners, cooling and heating capacity are not electrical input.
Choose kW or amps in the load details. If it is unclear, send Gold Coast Generators a photo of the plate.
Divide watts by 1,000 to get kW.
This is a high-level guide, not an electrical design or AS/NZS 3000 maximum-demand calculation. Typical assumptions cannot verify motor starting, phase balance or site conditions. Gold Coast Generators and a licensed electrical contractor or electrical engineer must confirm final sizing, especially for pumps, lifts, fire or medical equipment. Fixed-wiring connections require a licensed electrician and an approved changeover arrangement. Never run an engine-driven generator indoors.